• Federal Engineers & Constructors, Inc.

    • Contractors/Buildings
    • Contractors/Concrete
    • Contractors/Construction Management
    • Contractors/Heavy Civil
    • Contractors/Industrial
    • Project Management
    • Quality Control/Assurance/Requirements
    • Testing/Inspecting Services
    • Facility Decommissioning
    • Mobilization
    • Project Management and Coordination
    • Quality Assurance
    • Quality Control
    • Asbestos Remediation
    • Chemical Decontamination
    • Contaminated Site Material Removal
    • Demolition
    • Facility Remediation
    • Lead Remediation
    • Polychlorinate Biphenyl Remediation
    • Site Remediation
    • Cast-in-Place Concrete
    • Cementitious Grouting
    • Concrete Cutting
    • Concrete Finishing
    • Concrete Forming
    • Concrete Topping
    • Glass-Fiber-Reinforced Concrete
    • Grouting
    • Reinforcement Bars
    • Site-Cast Concrete
    • Applied Fireproofing
    • Fire-Suppression Water Storage
    • Water-Based Fire-Suppression Systems
    • Lighting
    • Low-Voltage Electrical Distribution
    • Caissons
    • Clearing and Grubbing
    • Concrete Raising
    • Earth Moving
    • Earth Stripping and Stockpiling
    • Earthwork Methods
    • Excavation and Fill
    • Grading
    • Site Clearing
    • Gas and Vapor Process Piping and Ductwork
    • Liquids Process Piping
    • Instrumentation and Control for Electrical Systems Lighting
    1955 Jadwin Avenue, Suite 470
    Richland, WA 99354
    (509) 375-1608
    (509) 375-3427 (fax)
    • About

      Construction, Environmental Remediation, Electrical

    • Whom to Contact

      • Steve Klover
        Vice President, ESH&Q/Safety and Training
        1955 Jadwin Avenue, Suite 470
        Richland, WA 99354
        Phone: (509) 375-1608
        Fax: (509) 375-3427